STAND NUMBER: M3098

Exhibiting at the Marine and Coastal Civil Engineering Expo

TOTAL CONSTRUCTION SUPPLIES

Total Construction Supplies entered the pile cage manufacturing market in 2014 and initially we began supplying loose rebar and helical for site fixed pile cages. With continuing investment and development, we gained full CARES approval for the manufacture of pre-fabricated pile cages, which conform to BS:7123 and UK CARES Assessment Schedule 6 & 10. As we progressed we undertook more complex projects and have purchased a fully automated cage wrapping machine, which means we can now offer a wider range of cage diameters - from as little as 120OD up to 1500OD.
We offer an in-house pile cage detailing service. CAD produced fabrication drawings are detailed by our experienced pile cage detailing team and are issued for approval prior to production.
At Total, we are continually looking for new and innovative solutions to common place problems experienced on site. One of the issues highlighted when we began manufacturing larger diameter multiple part cages was how these could be safely and efficiently connected on site. We were made aware of a new system - Super-Latch Cage Connector - which was still in the initial stages of its innovation. We were the first fabricator in the UK to manufacture and supply cages which utilised this new system. As site safety is the main issue that this product addresses, it is now more commonly specified at the design stage of a project. We have experienced fabricators with a detailed knowledge of manufacturing cages incorporating Super Latch and have assisted in obtaining approval for Road, Rail and Energy projects. Some of the projects we have supplied utilising this system include:
Network Rail, Wantage Bridge
Viaton Wind Turbine
Belhus Country Park, Essex
River Wall Replacement, Wandsworth
AELTC, Wimbledon
A50 Overbridge, Uttoxeter



Visit Website

01902 624220

Exhibitor product 1