Simon Lembrechts

Temporary Works Design

Simon Lembrechts is Business Developer at Temporary Works Design.

dont miss

Temporary Works for Marine Piling

Each construction project is unique and requires specific, bespoke temporary works and installation equipment, which largely defines the success of a project. Careful selection of the installation method, with the right level of automation or the right level of simplicity, will result in unique fit-for-purpose piling equipment, allowing for safe and swift project execution. An approach which integrates structural, mechanical and installation engineering, significantly contributes to the development of successful temporary works.